Phase 1 progress
Track status by track feet
UPRR hand-off checklist
UPRR-owned welds without an accepted test
Open punch items
Progress since calls began
Recent activity
Track status totals · TF
Station view
Each track laid out straight by station. Colors are current status; the dark band is UPRR ownership, the hatched band the 150 ft skeleton runout. Click a segment to inspect it.
Scope of work matrix
UPRR-installed items from Exhibit A sheet 3 of 13 (10/25/2026). Industry supplies; UPRR forces install unless noted.
| # | Item | Description | Qty | U/M | Track | Station(s) | Status | Note |
|---|
Weld register
Every thermite and flash-butt weld. UPRR-owned welds (Trk A 0+00–3+90.50, Trk B 85+36.98–89+28.36, Del Rio Sub) need an accepted UT before the UPRR portion is reported complete.
| No. | Track | Station | Type | Owner | Welded | NDT report | Result | Remarks |
|---|
NDT reports
| Report | Firm | Date | Method / code | Scope | Result |
|---|
Punch list
Items dropped on the plan or added here. UPRR asked that punch items be addressed before the final walkthrough.
| # | Item | Track | Station | Raised by | Assigned | Due | Status |
|---|
Weekly coordination call
Generated from the record. Close out the call to timestamp this week's position; the next sheet reports changes from it.
Press "Build sheet".
Call history
| Date | Trk A surfaced | Trk B surfaced | Loop surfaced | UPRR welds accepted | Plan stated |
|---|
Activity
Every change to the record, newest first.